Loading...
Loading...

Muchinda was appointed main electrical contractor for The Urban Hotel, delivering primary electrical infrastructure under the supervision of consulting engineers Dexterity System Solutions.
Rembrandt Properties Limited confirmed successful completion at a cost of USD 121,845.24 (reference letter, 23 August 2022); Dexterity System Solutions confirmed the works and materials were of high quality (reference letter, 10 August 2022).
Tell us your requirements and our engineers will follow up with a tailored scope and quotation.